Scale & Power
Facility scale
Server-room / small-DC range: 1–20 kW per rack. For PUE, 1.4–1.6 is typical air-cooled SME; measure yours with the PUE Calculator.
Your all-in business rate incl. taxes & grid fees — it's on your electricity bill. Typical: DE business ~0.19–0.25 · EU avg ~0.19 €/kWh. Same rate logic as the Energy Cost Calculator.
CapEx & Lifetimes
Capital costs
Site infrastructure (racks, UPS, cooling, PDU) typically costs more than the IT it hosts, but lives 2–3× longer — both are annualized straight-line.
OpEx
Operating costs
24/7 operation creates a fixed staffing floor that doesn't scale down with rack count — often the second-biggest OpEx after power.
SME scope — not hyperscale
This model is scoped for server rooms and small on-prem data centers (1–20 kW/rack, up to ~50 racks). AI/liquid-cooled hyperscale economics — 100 kW+ racks, €10M+/MW builds — are a different regime and deliberately out of scope.